Contact Us

For feedback and service inquiries, please contact:

SMC SLEX Inc.

11/F San Miguel Properties Centre,
7 St. Francis Street,
Mandaluyong City 1550
(632) 8584 4655

For RFID inquiries, please contact:

customercare@autosweeprfid.com

(02) 318-TOLL (8655)
https://autosweeprfid.com/web/

Our Business

SMC SLEX Inc. (formerly known as South Luzon Tollway Corporation) was incorporated in the Philippines on July 26,2000 primarily to engage in the rehabilitation, construction and expansion of the South Luzon Expressway (SLEX), from the Alabang viaduct to Lucena, Quezon.

Read More
Our Company
Corporate/Business Profile

SMC SLEX Inc. was incorporated in the Philippines on July 26,2000 primarily to engage in the rehabilitation, construction and expansion of the South Luzon Expressway (“SLEX”) from the Alabang Viaduct to Lucena, Quezon…

Read More
Mission, Vision and Values

As a subsidiary of San Miguel Corporation, SMC SLEX Inc. aligns its Mission and Vision with that of its parent corporation.

Read More
Board of Directors, Management Team and Executive Officers

Read More
Organizational Chart

Read More
Conglomerate Map or Group-Structure

Read More
Shareholding Structure

Read More
ARTICLE OF INCORPORATION AND BY-LAWS AND ALL AMENDMENTS

Read More
Business Operations

SMC SLEX Inc. is the concessionaire of the SLEX which currently spans 36.1 km from Alabang, Muntinlupa to Sto. Tomas, Batangas. The SLEX is one of the three major expressways that links Metro Manila to the key southern provinces of the Philippines, including CALABARZON. To the north of the SLEX is the Skyway System, and to the south is the Southern Tagalog Arterial Road ("STAR"). SLEX connects with Skyway System and STAR and is a key logistical backbone to the southern corridor of Metro Manila.

SLEX is composed of four project toll roads, three of which are currently operational. Under the concession, each project toll road required rehabilitation and/or construction works of the different segments of SLEX:

Project Toll Road 1 ("TR 1"): The Alabang Viaduct - 1.2 kms

TR1 involved the rehabilitation and upgrade of the Alabang viaduct which included the widening of third-grade portion of the roads, retrofitting of the existing structure, and the replacement and expansion of the elevated portion from 6 to 8 lanes.

Project Toll Road 2 (“TR 2”): Expansion from Filinvest Exit to Calamba, Laguna – 27.3 kms

TR2 involved the widening of the SLEX segment between Filinvest exit and Sta. Rosa, Laguna from 4 to 8 lanes and segment between Sta. Rosa, Laguna to Calamba, Laguna from 4 to 6 lanes.

Project Toll Road 3 (“TR 3”): Extension of the SLEX to Sto. Tomas, Batangas – 7.6 kms

TR3 involved the construction of a 4-lane roadway from Calamba, Laguna to Sto. Tomas Batangas. The construction of this section connected Metro Manila, SLEX, and STAR.

FUTURE PROJECTS / EXPANSION:
Project Toll Road 4 (“TR4”)

TR 4 involves a 4-lane roadway extension of TR 3 from Sto. Tomas, Batangas to Lucena City, Quezon with a length of 57.04 km (4-lane toll road).